Hayward Tyler Inc and its sister company Energy Steel have been awarded multi-million dollar contracts to help the ITER venture in France.
The ITER Project, St-Paul-lez-Durance, France, October 2021 – Image © Les Nouveaux Médias/SNC ENGAGE.
Hayward Tyler’s contract covers variable drive booster pumps while Energy Steel will provide sixty two solenoid valve and cubicle packages.
The ITER challenge is a joint worldwide research and improvement challenge to reveal the scientific and technical feasibility of fusion energy. The demonstration facility is underneath development in St-Paul-lez-Durance in France, and will be the largest fusion experimental reactor on the earth.
Hayward Tyler’s booster pumps will be an integral part of the drying system for the Tokamak Cooling Water System (TCWS). เกจวัดแรงลม shall be designed, built and tested at Hayward Tyler Inc in Colchester, Vermont, USA.
Hayward Tyler and Energy Steel are each part of the Engineered Pumps and Motors Division of Avingtrans plc.
“We are elated that two of our corporations can provide merchandise that can contribute to this ambitious venture,” said Mike Turmelle, managing director of Avingtrans’ Engineered Pumps and Motors Division. “We’re committed and proud to contribute to the advanced nuclear industry.” These contracts follow earlier awards that ITER has made to Avingtrans’ Engineered Pumps and Motors Division.
Share